Contact

Contact

Share your application, target specs, and quantity plan. We will respond with practical engineering and sourcing support.

Inquiry Email

[email protected]

Attach DWG, STEP, or PDF drawings and include purity, tolerance, quantity forecast, and delivery country.

Instant Chat

WhatsApp Engineering Support

Use WhatsApp for quick engineering clarification before a formal quote.

Direct RFQ Form

Submit the first RFQ package

Use the form for first-round specs. Email remains available for drawings, CAD files, and NDA-controlled attachments.

Email directly

If the form is unavailable, contact [email protected] or WhatsApp WhatsApp Engineering Support.

RFQ Checklist Before You Send

Required ItemExampleWhy It Helps
Target graphite componentCrucible size / purity grade / TaC coatingQuickly narrows viable materials and quote range.
Max operating temperaturee.g., 2400°C for SiC PVTPrevents premature material degradation in extreme environments.
CAD & Dimensional tolerancesSTEP/IGES file, 2D drawing (PDF), threading, and surface finishAvoids assembly interference inside the hot zone.
Quantity planPrototype qty + annual forecastImproves lead-time and pricing accuracy.
Destination and termsCountry, Incoterm, requested ship dateAligns packaging, documents, and shipping plan early.

What Happens After Inquiry

  1. Engineering pre-check for model fit and data completeness.
  2. Quote direction with lead-time assumptions and risk notes.
  3. Sample scope alignment and validation acceptance criteria.
  4. Production and delivery planning for approved programs.

Evidence and Claim Boundaries

Documents buyers can request

  • Graphite grade, density, and material-batch reference.
  • Ash, impurity, coating, or inspection report scope agreed before sample approval.
  • Critical-dimension inspection, cleaning, sealing, packaging, and photo records when required by RFQ.

What must be confirmed before PO

  • Certification, origin, and compliance files are quoted only when available and requested.
  • Furnace fit, coating life, and process outcome depend on buyer-side validation.
  • Final lead time depends on drawing complexity, purification, coating, quantity, destination, and documents.

Common Clarification Questions

Can I send a rough requirement before final drawings are ready?

Yes. Send your current assumptions first, then mark pending items clearly so we can return a provisional quote scope.

How should we handle engineering changes after sample approval?

Use a revision-controlled change request with effective lot and impact scope agreed by both teams.

Can we align on compliance files before mass production?

Yes. Please list required document types in the RFQ stage so they are included in validation and delivery planning.

Suggested First RFQ Email Format

If your team needs a fast start, use this structure in the first email. It improves quote precision and reduces clarification cycles.

  1. Project background and application scenario.
  2. Graphite component target: size candidate, purity grade, thermal environment.
  3. Dimensional interface: drawing revision, tolerances, surface finish.
  4. Commercial scope: prototype quantity, annual forecast, destination, and target ship date.

What You Should Review Before Sending RFQ

Typical First Response Package

OutputPurposeBuyer Action
Material and architecture directionNarrow viable options against thermal and purity assumptions.Confirm baseline model path before cost-detail discussion.
RFQ clarification listClose data gaps that affect pricing and lead-time accuracy.Return missing values and drawing references in one reply.
Validation recommendationDefine sample test scope and acceptance evidence for technical sign-off.Align internal engineering and procurement gates before PO.
Consult Engineering via WhatsApp